. Construction : a journal for the architectural engineering and contracting interests of Canada . th spectators gallery, locker room andshower baths. Quite separate from the above, and yet so placedthat communication can be arranged, the library,committee rooms, cafeteria and kitchen are offices of the Metropolitan Board are also onthis floor. Illustrations are given of the boys gym-nasium and game room, the mens library and read-ing room and the restaurant, the wood finish in allcases being fumed oak. such that dumb waiter communication reaches theboys gymnasium, mens gymnasium


. Construction : a journal for the architectural engineering and contracting interests of Canada . th spectators gallery, locker room andshower baths. Quite separate from the above, and yet so placedthat communication can be arranged, the library,committee rooms, cafeteria and kitchen are offices of the Metropolitan Board are also onthis floor. Illustrations are given of the boys gym-nasium and game room, the mens library and read-ing room and the restaurant, the wood finish in allcases being fumed oak. such that dumb waiter communication reaches theboys gymnasium, mens gymnasium and auditorium,making it possible to serve dinners or associationbanquets in any or all of these audience rooms withconsiderable ease, requiring only the additional helpnecessary to meet the demand on the kitchen re-sources. The power plant and equipment is in a separatebuilding in the rear, placed with due regard for con-venience and economy in operation, and serving allthe requirements of main building. The total cost of the building without furnishingswas about $397, CONSTRUCTION 257. riiK t\ Kll^l:^CRA^S jDETAIL or PLUXGE. NEW CENTRAL BUILDING, AXO ROSS & MACI-ARLANE, MONTREAL. QUE. ARCHITECTS. _5S CONSTRUCTION


Size: 1533px × 1629px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bo, bookcentury1900, booksubjectarchitecture, booksubjectbuilding