KENNEDY SPACE CENTER, FLA. - The immense size of the External Tank is captured here as a crane lowers it between the Solid Rocket Boosters (SRBs) on the Mobile Launcher Platform. The ET, designated for the Return to Flight mission STS-114, will be mated to the SRBs for launch. The 154-foot long ET is recently redesigned to meet recommendations of the Columbia Accident Investigation Board before returning to flight. Among dozens of changes is a redesigned forward bipod fitting to reduce the risk to the Space Shuttle from falling debris during ascent. Considered a test flight, STS-114 is schedul


KENNEDY SPACE CENTER, FLA. - The immense size of the External Tank is captured here as a crane lowers it between the Solid Rocket Boosters (SRBs) on the Mobile Launcher Platform. The ET, designated for the Return to Flight mission STS-114, will be mated to the SRBs for launch. The 154-foot long ET is recently redesigned to meet recommendations of the Columbia Accident Investigation Board before returning to flight. Among dozens of changes is a redesigned forward bipod fitting to reduce the risk to the Space Shuttle from falling debris during ascent. Considered a test flight, STS-114 is scheduled to launch during a window extending May 15 to June 3. The Shuttle will carry supplies and equipment to the International Space Station.


Size: 3000px × 1993px
Photo credit: © NASA/piemags / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: .