. The Architect & engineer of California and the Pacific Coast . mestic arts and science ro<ims, auditorium seating 500 persons and necessary ad-juncts. Cost, including architects fees, not to exceed $45,000. Thomas Edison school to contain eleven class rooms, commercial rooms, drawingroom, printing room, manual training room, domestic arts and science rooms, auditoriumseating 500 persons and necessary adjuncts. Cost, including architects fees, not to exceed? Francis Willard school to conitain eighteen class rooms, manual training room, audi-torium seating 700 persons and necessary a


. The Architect & engineer of California and the Pacific Coast . mestic arts and science ro<ims, auditorium seating 500 persons and necessary ad-juncts. Cost, including architects fees, not to exceed $45,000. Thomas Edison school to contain eleven class rooms, commercial rooms, drawingroom, printing room, manual training room, domestic arts and science rooms, auditoriumseating 500 persons and necessary adjuncts. Cost, including architects fees, not to exceed? Francis Willard school to conitain eighteen class rooms, manual training room, audi-torium seating 700 persons and necessary adjuncts. Two frame buildings in rear to bealtered into domestic arts and science buildings and teachers building. Cost, includingarchitects fees, not to exceed $90,000. The programmes of work entrusted to the architects did not include furnishings, equip-inents, yard surface, planting or preparation of the site. The architects contract with thecity prescribed that he should design a building with the requirement of the programme 5fi Tlie Architrci and Engineer. Entranc cloil. John M:,ir School, Berhcle for the amount ofmoney designated inthe programme, other-wise his plans mightbe thrown out by theCouncil. Anythingthat was given in ex-cess of the progranmieof course was wel-come. No mention wasmade in the pro-gramme of the mate-rials of which thebuildings were to beconstructed, as all thearchitects, except thecity architect, believedit impossible to obtainanything except framebuildings. The tirst schemeswere submitted Janu-ary 15, January 18and January 19. In a number of cases the schemes would have been different had thecity architect or Council alone decided the matter. The city architect acted as Leland was chosen heating and ventilating engineer for all the schools are examples of good buildings erected at the least possible Edison school in South Berkeley is particularly remarkable in thisrespect: Its design is in the Old Colonial style, ha


Size: 1885px × 1326px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookcentury1900, bookdecade1900, booksub, booksubjectarchitecture