360m cut and cover tunnel being speedily assembled using precast concrete segments on the Channel Tunnel Rail Link.
Cut-and-cover is a relatively speedy and economical method of construction for shallow tunnels where a trench (or cut) is excavated and roofed over. A strong overhead support system carries the load of the covering material. The tunnel may be of in- situ concrete, precast concrete, precast arches or corrugated steel arches (with brickwork being used in the past). The trench is then covered over and the surface reinstated. The tunnel pictured is 360m long and was constructed in just 4 weeks. The £ billion Channel Tunnel Rail Link (now High Speed One) was built between 1998-2007 and partly funded by the European Union, it forms a section of the Trans European Rail Network. It is basically a French-style high-speed rail line linking London with the Channel Tunnel, the Eurostar trains were developed on proven technology from the French TGV high-speed system. Stations on the CTRL are the existing Ashford International and new stations at Ebbsfleet and Stratford. The line ends at the rebuilt St. Pancras. Fourteen new tunnels were constructed, the longest being the London Tunnel which is long from Ripple Lane to Stratford, after which the line briefly comes to the surface at Stratford Station. Five huge shafts of diameter ventilate the twin bore, single-track tunnels and provide emergency access and evacuation points. The line passes in tunnel under the River Thames and crosses the M25 at Thurrock. For the Thames crossing (a 3km twin-bore tunnel), the line drops 1 in 40 down under the river and then climbs 1 in 40 up, curving at the same time. The CTRL then negotiates the M25 motorway, going under the southbound and over the northbound carriageway. Lengthy loops at two places along the route allow trains to be overtaken so freight and faster domestic trains can be mixed with 300 kph Eurostar high-speed services. In total, the new line took 9 years to build and comprises 109kms of new track, 152 new bridges, 3 viaducts and 14 new tunnels.
Size: 2432px × 2432px
Location: Hollingbourne, Kent , UK
Photo credit: © qaphotos.com / Alamy / Afripics
License: Licensed
Model Released: No
Keywords: -vi, a2, assemble, assembly, atp, automatic, bridge, brussels, build, builder, building, business, channel, checking, civil, collapse, commuter, concession, concessionaire, concrete, connection, construct, construction, consultant, continental, contractor, control, corridor, cover, crane, crossing, ctrl, cut, du, economy, eec, employee, engineer, engineering, equipment, erect, erection, europe, european, eurostar, eurotunnel, finance, gare, groundwater, grout, hard, hat, helmet, high, hs1, industrial, industry, infrastructure, integration, international, kent, line, lining, link, london, m20, management, manager, monitoring, network, nord, operate, pancras, paris, partnership, passenger, pfi, ppe, ppp, precast, pressure, private, privatisation, project, protection, protective, public, quality, rail, railroad, railtrack, railway, railways, reinforced, ring, road, rolling, route, safety, segment, segments, signal, signalling, site, speed, st, staff, station, steel, stock, support, surveyor, technology, techspan, ten, tgv, tourist, track, trackwork, train, trans, transport, transportation, tube, tunnel, tunneller, tunnelling, uk, union, urban, viaduct, visibility, water, waterloo, waterproof, worker, workforce