PROCESS WATER BUILDING, TRA-605. FLOOR AND ROOF PLANS FOR SECOND FLOOR. DETAILS OF CONCRETE ROOF SLABS. FLASH EVAPORATOR SUPPORTS AND PIPE OPENINGS TO TANKS BELOW. NOTE SPECIFIES THAT EQUIPMENT IS TO BE INSTALLED BEFORE ERECTION OF ROOF AND WALLS. BLAW-KNOX 3150-805-4, 1-1951. INL INDEX NO. 531-0605-62-098-100660, REV. 2. - Idaho National Engineering Laboratory, Test Reactor Area, Materials and Engineering Test Reactors, Scoville, Butte County, ID


Size: 5549px × 4504px
Photo credit: © Tango Images / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: