Canadian engineer . i<p Roils(3 4 BpT SECTION AA 10 Note Conciete- 1 2 < graded andwusUed gravcL Reinforclnp- All rods lappedIfeat jointit. Uods clamped togetheraX all - % Bolts 2Rowsotl3-5i0RodssWggei:ed. ? Concrete Placed under WaterVERTICAL SECTION CC dJsection bb Fig. 3.—Reinforced Concrete Infiltration Well. As the construe ion of the well was only a small part ofthe work done at Sil^^er Grove, and as the entire job hasliot been closed up, only approximate costs can be givenThe figures show the actual costs of construction, and donot include engineerin


Canadian engineer . i<p Roils(3 4 BpT SECTION AA 10 Note Conciete- 1 2 < graded andwusUed gravcL Reinforclnp- All rods lappedIfeat jointit. Uods clamped togetheraX all - % Bolts 2Rowsotl3-5i0RodssWggei:ed. ? Concrete Placed under WaterVERTICAL SECTION CC dJsection bb Fig. 3.—Reinforced Concrete Infiltration Well. As the construe ion of the well was only a small part ofthe work done at Sil^^er Grove, and as the entire job hasliot been closed up, only approximate costs can be givenThe figures show the actual costs of construction, and donot include engineering, drafting, and other overheadcharges. Grading and excavating 37o cu. yd. at $ All concrete, including reinforcement, material 260 o-15 All concrete, including reinforcement, labor 280 3-85 All forms, material, and labor at $ per cu. yd. All steelwork, fabricated and otherwise, material 28,000 lb. at $0,052 All steelwork, fabricated and otherwise, labor 28,000 (Costs of steel include painting.) All equipment, piping, wiring, etc., in place $6,200 This pumping station was designed, constructed, andequipped by Westinghouse, Church, Kerr and Company, ofNew York. 642 THE CANADIAIT E


Size: 1248px × 2002px
Photo credit: © The Reading Room / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookcentury1800, bookdecade1890, bookpublishertoron, bookyear1893