Alstom Heavy Haulage Electrical National Grid transformer, being delivered at Holme Road, Preston, Lancashire, UK


This enormous electrical transformer is being delivered in two sections – each weighing 271 tonnes. The first part of the load was delivered on Sunday, March 6 with the second part of the transformer following the same route on the 19th March, 2011


Size: 5120px × 3413px
Location: Holme Road, Preston, Lancashire, UK
Photo credit: © Cernan Elias / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: -vis, adult, adults, alleys, alstrom, cargo, concept, construction, delivering, delivery, dock, docking, docks, electrical, employees, energy, england, european, goldhofer, grid, hard, harness, hats, haulage, heavy, heavy-lifting, helmets, hire, holme, industry, infrastructure, jackets, jobs, lancashire, liebherr, load, loads, male, men, national, onlookers, people, person, persons, power, preston, ribble, river, road, safety, site, specialist, specialists, stafford, trailer, transfer, transferring, transfo, transformer, transformers, uk, unloading, vehicles, western, winch, winches, work, worked, worker, workers, working, works, worksite