Watersnood 1953. Sand and bilsen are supplied with trains and on the spot near the Moerdijk bridge the sand is immediately poured, so that the rails, which now has no support but simply hangs, feel some ground again. The entire railway dike has fallen down about meters over a long distance. First requirement is to increase this part of the railway. It is hoped to be ready in 6 weeks Date: 10 February 1953 Location: Moerdijk Keywords: repairs, floods, railways, trains, devastations


Size: 3078px × 2274px
Photo credit: © BNA Photographic / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: