Construction equipment operates atop the 8-mile-long earthen embankment known as Moose Creek Dam at the Chena River Lakes Flood Control Project near North Pole, Alaska. The Army Corps of Engineers – Alaska District is reinforcing about miles of the dam by installing a mix-in-place concrete barrier wall. Currently, the safety improvement project is about halfway complete with work anticipated to be done by January 2026.


Size: 1934px × 1750px
Photo credit: © APFootage / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: alaska, civil, dam, fairbanks, safety, usace, works