Wind turbine parts destined for the Walney offshore wind farm on the docks at Mostyn.


Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, MW turbines, giving a total capacity of the Walney project of MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows the Jack up barge, the Krakken being loaded.


Size: 4368px × 2912px
Photo credit: © Ashley Cooper / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: barge, coast, construction, crane, docks, dong, electricty, energy, farm, jack, mostyn, north, offshore, piece, port, power, renewable, siemens, tower, turbine, wales, wharf, wind