. Instructions for installing modern plumbing systems. Photo No. 27. Connections at base of stack Next you can build up the vertical soilstack to the bathroom and then to theroof. This is done in very much the samemanner as was described on pages 4 and 5,to which we refer you. You can avoid mak-ing a horizontal calk joint between the closetbend and the soil pipe tee at the bathroomfloor by calking the closet bend into thetee before calking the tee into the pipe com-ing up from below. Be sure that you haveyour closet bend the proper length, as calledfor by the roughing-in measurements ofyour cl


. Instructions for installing modern plumbing systems. Photo No. 27. Connections at base of stack Next you can build up the vertical soilstack to the bathroom and then to theroof. This is done in very much the samemanner as was described on pages 4 and 5,to which we refer you. You can avoid mak-ing a horizontal calk joint between the closetbend and the soil pipe tee at the bathroomfloor by calking the closet bend into thetee before calking the tee into the pipe com-ing up from below. Be sure that you haveyour closet bend the proper length, as calledfor by the roughing-in measurements ofyour closet, before calking it into the No. 28 shows the closet bend calkedinto the tee. Of course, in the soil stack in this instal-lation there will be no tapped tee abovethe closet, because there will be no reventpipe from the lavatory and bathtub to gointo the stack. Installing Waste Pipe for Lava-tory and Bathtub The first thing to bear in mind is thatthe waste pipe runs at a higher level thanthe side opening of the closet bend intowhich it e


Size: 1389px × 1799px
Photo credit: © The Reading Room / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookcentury1900, bookdecade1920, booksubjectdivisio, bookyear1922