The Emscher, wastewater river, will be renaturalised after the completion of the Emscher wastewater canal, road bridge, B224, Gladbacher Strasse, high


The Emscher, wastewater river, will be renaturalised after the completion of the Emscher wastewater canal, road bridge, B224, Gladbacher Strasse, high-voltage pylons at the Essen-Karnap waste-fired power plant, RWE Power, Essen NRW, Germany,


Size: 7908px × 5275px
Location: Essen, Germany
Photo credit: © Jochen Tack / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: area, b224, bridge, canal, canalised, cesspool, change, electricity, emscher, emschergenossenschaft, energy, environmental, gladbecker, grid, halde, high-voltage, industrial, infrastructure, kilovolt, line, lines, logistics, metropole, north, nrw, operator, overhead, power, protection, pylon, pylons, reconstruction, renaturation, renewal, rhine-westphalia, river, riverbed, road, route, ruhr, ruhrpott, ruhrrevier, schurenbach, sewage, sewer, steel, strasse, structural, supply, system, trailer, transmission, transport, transporter, truck, truss, waste, wastewater