In this view looking down inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida on March 14, 2022, most of the work platforms have been retracted from around the Artemis I Space Launch System rocket and Orion spacecraft in preparation to roll out to launch pad 39B. The Kennedy ground systems team is working to remove equipment and scaffolding away from the rocket and will continue retracting the platforms until the entire rocket is revealed ahead of the wet dress rehearsal test, which is scheduled to occur approximately two weeks after it arrives to 39B. Artemis I is t
In this view looking down inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida on March 14, 2022, most of the work platforms have been retracted from around the Artemis I Space Launch System rocket and Orion spacecraft in preparation to roll out to launch pad 39B. The Kennedy ground systems team is working to remove equipment and scaffolding away from the rocket and will continue retracting the platforms until the entire rocket is revealed ahead of the wet dress rehearsal test, which is scheduled to occur approximately two weeks after it arrives to 39B. Artemis I is the first in a series of increasingly complex missions that will enable human exploration to the Moon and Mars.
Size: 4480px × 6720px
Photo credit: © NASA/piemags / Alamy / Afripics
License: Licensed
Model Released: No
Keywords: artemis, dress, egs, ksc, ml, orion, rehearsal, rollout, sls, vab, wdr, wet