. Case histories of Corps breakwater and jetty structures. Report 3. Breakwaters; Jetties; Breakwaters; Jetties. -2'-0" BEDDING STONE I I-L8. TO 50-L8 QUARRY SPALLS I -16 TON TOE STONE REACH-A BUILT 1975. -2-0" BEDDING STONE ( I-L8 TO 50-L8. QUARRY SPALLS ) -10 TON TOE STONE REACH-B. Please note that these images are extracted from scanned page images that may have been digitally enhanced for readability - coloration and appearance of these illustrations may not perfectly resemble the original Bottin, Robert R; U. S. Army Engineer Waterways Experiment Station; United States. A


. Case histories of Corps breakwater and jetty structures. Report 3. Breakwaters; Jetties; Breakwaters; Jetties. -2'-0" BEDDING STONE I I-L8. TO 50-L8 QUARRY SPALLS I -16 TON TOE STONE REACH-A BUILT 1975. -2-0" BEDDING STONE ( I-L8 TO 50-L8. QUARRY SPALLS ) -10 TON TOE STONE REACH-B. Please note that these images are extracted from scanned page images that may have been digitally enhanced for readability - coloration and appearance of these illustrations may not perfectly resemble the original Bottin, Robert R; U. S. Army Engineer Waterways Experiment Station; United States. Army. Corps of Engineers; Repair, Evaluation, Maintenance, and Rehabilitation Research Program. [Vicksburg, Miss. : U. S. Army Engineer Waterways Experiment Station ; Springfield, Va. : available from National Technical Information Center]


Size: 2782px × 899px
Photo credit: © Book Worm / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., boo, bookauthorunitedstatesarmycorpsofengineers, bookcentury1900