. Electric railway gazette . No current flows in the cross-connections until they areunder the brushes, for the cross-connected bobbins arealways at the same potential or pressure. When any seg-ment is under the brush a current flows in the cross-con-nection, not from bobbin to bobbin, but from bobbin tooutside circuit, as shown by the arrows in the figure. Thewires connecting the two like brushes together is simplyreplaced by the cross-connections. 20 ELECTRIC RAILWAY GAZETTE. Voi,. XIII. No. 2. The winding shown in Fig. 22 is of a totally differenttvpe. The convenient arrangement of two btus
. Electric railway gazette . No current flows in the cross-connections until they areunder the brushes, for the cross-connected bobbins arealways at the same potential or pressure. When any seg-ment is under the brush a current flows in the cross-con-nection, not from bobbin to bobbin, but from bobbin tooutside circuit, as shown by the arrows in the figure. Thewires connecting the two like brushes together is simplyreplaced by the cross-connections. 20 ELECTRIC RAILWAY GAZETTE. Voi,. XIII. No. 2. The winding shown in Fig. 22 is of a totally differenttvpe. The convenient arrangement of two btushes on thequarter is accomplished by winding the armature so, thatthe similar bobbins are placed in series instead of tracing out the current in the winding of Fig. 22 it willbe seen that there are two paths through the armature,instead of four as in Fig. 21. Other things being equal,this has the object of doubling the torque and halving thespeed that would occur were the armature parallel speed and po
Size: 2295px × 1088px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No
Keywords: ., bookcentury1800, bookdecade1890, bookpublishernewyo, bookyear1895