Erecting installing, assembly of tower and nacelle Drumderg 32-megawatt Wind Farm. Scottish & Southern Energy Drumderg hill, Alyth, Perthshire, UK


Most large wind turbines are delivered with tubular steel towers, which are manufactured in sections of 20-30 metres with flanges at either end, and bolted together on the site. The towers are conical ( with their diameter increasing towards the base) in order to increase their strength and to save materials at the same time.


Size: 3413px × 5120px
Location: Drumderg windfarm Alyth Scotland uk
Photo credit: © MediaWorldImages / Alamy / Afripics
License: Royalty Free
Model Released: No

Keywords: -righted, 32-megawatt, alyth, aspiration, assembly, assist, auxiliary, blade, blades, boom, carbon, clean, commercial, components, crane, dangerous, detachable, drumderg, electricity-generating, energy, erection, farm, farms, gas, gigantic, green, greenhouse, heavy, height, hub, industrial, industry, installations, lift, machinery, mill, nacelle, natural, output, part, pieces, power, procedure, propellor, public, reduction, renewable, rotating, rotor, scotland, technologies, tower, towers, triple, turbine, utility, vane, vanes, vertical, wind, windfarm, windtowers, windturbine, work