A milestone in the construction of the Louisville VA Medical Center took place Feb. 21 as the first blast of the project was completed. Blasting, which is a construction practice used in removing bedrock, is required to install key portions of structures on the construction site along with utilities for the facilities. Construction is scheduled to be complete in 2026.


Size: 3000px × 1987px
Photo credit: © NB/IA / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: engineers, lrd, usace, va, veteran