The closure of the hole in the seawall at Rilland-Bath on Zuid-Beveland. Thursday the gap was closed, but Friday it turned out that the work had been in vain and there was again a gap of about 60 meters. In the second half of April, it is hoped that a vessel will be closed down, which will then be sunk in the hole. With the delivery of sandbags and by using a conveyor for sandbags, we are now trying to keep the gap on width Date: 10 April 1953 Location: Rilland-Bath, Zierikzee Keywords: dikes, repairs, floods, sandbags


Size: 3065px × 2283px
Photo credit: © BNA Photographic / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: