Construction workers is safety harnesses on job site for Leed platinum Common Ground High School.


Construction workers install wall panels on Leed Platinum Common Ground High School building. 15,000 square foot building was built off-site, then installed in pieces via crane. Some interior wood is engineered lumber created by the Enviro-Lam process invented by Nordic Structures, that uses pieces as small as 1 x 2 inches to create structurally strong pieces glued with water based adhesives. Roof and wall panels come pre-insulated. Glulam construction is part of new green architectural trend called Mass Timber Construction


Size: 7317px × 4912px
Location: New Haven, CT. USA
Photo credit: © Michael Doolittle / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: construction, green, hard, hardhat, harness, harnesses, hat, modular, safety, tether, tethers, worker, workers