Inside the Launch Control Center’s Firing Room 1 at NASA’s Kennedy Space Center in Florida, Coleen Orr, a core stage electrical power system engineer, participates in an Artemis I launch countdown training exercise on Feb. 3, 2020. Under the leadership of Launch Director Charlie Blackwell-Thompson, a team of nearly 100 engineers from Orion, Space Launch System (SLS) and NASA’s Exploration Ground Systems came together to work through a series of simulated challenges, as well as a final countdown procedure. During these exercises, different issues were introduced to familiarize the team with lau


Inside the Launch Control Center’s Firing Room 1 at NASA’s Kennedy Space Center in Florida, Coleen Orr, a core stage electrical power system engineer, participates in an Artemis I launch countdown training exercise on Feb. 3, 2020. Under the leadership of Launch Director Charlie Blackwell-Thompson, a team of nearly 100 engineers from Orion, Space Launch System (SLS) and NASA’s Exploration Ground Systems came together to work through a series of simulated challenges, as well as a final countdown procedure. During these exercises, different issues were introduced to familiarize the team with launch day operations, while providing them with an opportunity to practice how they would handle those issues in real-time. Artemis I will be the first integrated test flight of the Orion spacecraft and SLS rocket – the system that will ultimately land the first woman and the next man on the Moon.


Size: 6720px × 4480px
Photo credit: © NASA/piemags / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: 1, application, artemis, center, command, control, egs, exploration, firing, flight, ground, launch, orion, room, sls, software, space, spaceport, system, systems