Journal of the Association of Engineering Societies . Fig. 8. Project of Wall with Piles and Panels of Cement Arme. sometimes quite violently, and to distribute the effects over all thatpart of the structure which emerges above the level of the sea. These braces are made on the spot and united with the pileswithout any articulation; that is to say, they are cemented into thepiles. At Novorossisk they were constructed in one horizontal plane,at 4 inches above low water, and their dimensions were 11 yf x y\inches. The construction, a single horizontal plane, obviates thepossibility of shearing a
Journal of the Association of Engineering Societies . Fig. 8. Project of Wall with Piles and Panels of Cement Arme. sometimes quite violently, and to distribute the effects over all thatpart of the structure which emerges above the level of the sea. These braces are made on the spot and united with the pileswithout any articulation; that is to say, they are cemented into thepiles. At Novorossisk they were constructed in one horizontal plane,at 4 inches above low water, and their dimensions were 11 yf x y\inches. The construction, a single horizontal plane, obviates thepossibility of shearing action, caused by lateral efforts, to which thestructure would be subjected if the braces were placed at differentlevels. The many uses to which armored concrete may be put require COXCRETE-METAL CONSTRUCTION. 121 no special form of iron, and any iron, round, square or flat, can beemployed. In the construction of all kinds of armored concrete, even in themaking of columns, floorings and walls of buildings, the variousparts are molded and constructe
Size: 1560px × 1602px
Photo credit: © The Reading Room / Alamy / Afripics
License: Licensed
Model Released: No
Keywords: ., bookcentury1800, bookdecade1880, booksubjectenginee, bookyear1881