PREPARATIONS FOR SECOND FRONT AN ARMOURED BRIGADE'S MOVEMENT TRAINING - Bridge of Valentine being laid on to separate Warflat by tank. The bridge is intended to carry 18 tons but will take a Sherman [30 tons] tank. Span is about 30 feet. After the bridge is in position the vehicle is detached and is available for further activities as bridge carrier and layer British Army
Size: 2298px × 2175px
Photo credit: © piemags/ww2archive / Alamy / Afripics
License: Licensed
Model Released: No
Keywords: