. Building a railroad; a handbook devoted to a new, speedy and economical method of performing every operation from grading right-of-way to ballasting and maintaining track . building a Railroad Grading—Making Cuts Working Against a Light Face and Casting Over Crew line-up same asin grubbing and pullingstumps: One operator forAmerican Ditcher. One fireman forAmerican Ditcher. Two laborers. One man and Diichsr Worliing in a Cut With the Americafi on center grade line themaximum cut that can be made and cast all thematerial over on the sides, so the material will notfall back into the cut


. Building a railroad; a handbook devoted to a new, speedy and economical method of performing every operation from grading right-of-way to ballasting and maintaining track . building a Railroad Grading—Making Cuts Working Against a Light Face and Casting Over Crew line-up same asin grubbing and pullingstumps: One operator forAmerican Ditcher. One fireman forAmerican Ditcher. Two laborers. One man and Diichsr Worliing in a Cut With the Americafi on center grade line themaximum cut that can be made and cast all thematerial over on the sides, so the material will notfall back into the cut, is Depth of cut, 5 ft. 6 at bottom, 16 , \Y2 to 1.


Size: 2039px × 1225px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookauth, bookcentury1900, bookdecade1910, bookidcu31924004135566