Creosoted timer . I late 8. 28 CREOSOTED TIMBER scraping of the sling chains, handsticks, etc., and the rabbingagainst the ways of the piledriver. Plates 6 and 7 represent a sheet-pile bulkhead, forming. Plate 9. a retaining wall and lumber wharf along a canal. The con-struction is simple, consisting of a single row of creosotedplank four inches thick, supported at the top by a longi- ITS PREPARATION AND USES 29
Size: 1438px × 1738px
Photo credit: © The Reading Room / Alamy / Afripics
License: Licensed
Model Released: No
Keywords: ., bo, bookcentury1900, bookdecade1900, bookpublishernp, bookyear1900