Kanaalgedeelte Schotdeuren-Gorinchem Swing bridge in the street road Gorinchem-Vianen near the station Arkel. Pitch south of the bridge near the bridge guard house Annotation: The bridge has two openings, each wide 14M, length measured in the axis , distance main beams (also handrails) in middle , width between main beams (also handrails) 5M, height of main beams outside works in the middle , height main beams outside at the ends , In open position, the bridges dropped, by the own weight , in closed position, loaded with 400kg per M2, proved to be the largest deflec


Kanaalgedeelte Schotdeuren-Gorinchem Swing bridge in the street road Gorinchem-Vianen near the station Arkel. Pitch south of the bridge near the bridge guard house Annotation: The bridge has two openings, each wide 14M, length measured in the axis , distance main beams (also handrails) in middle , width between main beams (also handrails) 5M, height of main beams outside works in the middle , height main beams outside at the ends , In open position, the bridges dropped, by the own weight , in closed position, loaded with 400kg per M2, proved to be the largest deflection 5mm, the height is 7mm. The bridge is rotated by a man in 70-80 sec. over 90 degrees and set up in 20 and loosened in 15 sec. The bridge is processed, with in understanding of spindle holder, spindle, toothring, cushions etc. Riveted iron 49635 kg, profile iron 5270 kg, forged iron 1234 kg, forged steel 4271 kg, cast iron 4720 kg, phosphorus bronze 90 kg, American wood 24 M3 21600 kg total 86820 kg. Holland Keywords: dredgers, constructions, swing bridges, hydraulic engineering


Size: 3059px × 2288px
Photo credit: © BNA Photographic / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: