. The Street railway journal . OPEN SLOT CONDUIT CONSTRUCTION, LONDON UNITEDTRAMWAYS COMPANY. stones with a bed of concrete, all as described for the tramwayswhich are to be reconstructed. Bonding and Joint Plates of These Tramways—To admit of thecorporation bonding these tramways, the contractor to lift somuch of the causeway at each joint as may be necessary, theseopenings being about one-third of a square yard at each will be afterwards repaved and grouted with bitumen, etc.,all as described for the general work. The contractor will also lifta strip of causeway, two stones in br


. The Street railway journal . OPEN SLOT CONDUIT CONSTRUCTION, LONDON UNITEDTRAMWAYS COMPANY. stones with a bed of concrete, all as described for the tramwayswhich are to be reconstructed. Bonding and Joint Plates of These Tramways—To admit of thecorporation bonding these tramways, the contractor to lift somuch of the causeway at each joint as may be necessary, theseopenings being about one-third of a square yard at each will be afterwards repaved and grouted with bitumen, etc.,all as described for the general work. The contractor will also lifta strip of causeway, two stones in breadth, across the full widthof the tramway double line, for cross bonding, at every third 45 or every second 60 ft. rail. These will be thereafter filled inand grouted as before described. The openings for bonding tobe done at such times as the engineer may direct.


Size: 1628px × 1535px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookcentury1800, bookdecade1880, booksubjectstreetr, bookyear1884