. Building and repairing railways . VsKSKilNNH^^ Fig. 19. ENGINEERS into 10, 20, SO, 40, 50 and 60 parts to the Fig. 20. PROTRACTOR. tions where stakes are driven, the elevation be-tween the stakes where the slope of the ground 64 BUILDING AND REPAIRING RAILWAYS. changes and the correct location of this point; theelevation of the water in streams; the elevation of


Size: 2056px × 1215px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookcentury1900, bookdecade1900, booksubjectrailroa, bookyear1901