Charlie Blackwell-Thompson, Artemis I launch director, is seen in Firing Room One of the Rocco A. Petrone Launch Control Center as NASA’s Space Launch System (SLS) rocket with the Orion spacecraft aboard atop a mobile launcher rolls out of High Bay 3 of the Vehicle Assembly Building for the first time to Launch Complex 39B, Thursday, March 17, 2022, at NASA’s Kennedy Space Center in Florida. Ahead of NASA’s Artemis I flight test, the fully stacked and integrated SLS rocket and Orion spacecraft will undergo a wet dress rehearsal at Launch Complex 39B to verify systems and practice countdown pro
Charlie Blackwell-Thompson, Artemis I launch director, is seen in Firing Room One of the Rocco A. Petrone Launch Control Center as NASA’s Space Launch System (SLS) rocket with the Orion spacecraft aboard atop a mobile launcher rolls out of High Bay 3 of the Vehicle Assembly Building for the first time to Launch Complex 39B, Thursday, March 17, 2022, at NASA’s Kennedy Space Center in Florida. Ahead of NASA’s Artemis I flight test, the fully stacked and integrated SLS rocket and Orion spacecraft will undergo a wet dress rehearsal at Launch Complex 39B to verify systems and practice countdown procedures for the first launch.
Size: 3984px × 5274px
Photo credit: © NASA/piemags / Alamy / Afripics
License: Licensed
Model Released: No
Keywords: 2, artemis, blackwell-thompson, canaveral, cape, charlie, crawler-transporter, dress, rehearsal, wet