. The street railway review . SECTION THROlCIl HOlSE AND STORAGE. delivering current at 600 volts. The alternating current for the mainstation sub-station is not taken direct from the generator but isstepped down through three 150-kw. Wagner transformers from thehigh potential bus bars. .At all of the sub-stalions the rotaries arestarted from the alternating current side, there being connections tothe transformers to give half the working potential for starting. a 400-k\v. Bullock rotary converter, furnishing direct current at (100volts and three 150-kw., 25-cycle Wagner oil cool
. The street railway review . SECTION THROlCIl HOlSE AND STORAGE. delivering current at 600 volts. The alternating current for the mainstation sub-station is not taken direct from the generator but isstepped down through three 150-kw. Wagner transformers from thehigh potential bus bars. .At all of the sub-stalions the rotaries arestarted from the alternating current side, there being connections tothe transformers to give half the working potential for starting. a 400-k\v. Bullock rotary converter, furnishing direct current at (100volts and three 150-kw., 25-cycle Wagner oil cooled transformersfor stepping down the three-phase current from 27,000 volts to ,175volts. The oil switches for controlling the high tension current areplaced in compartments at the side of the building with bus bars sup-portefl o\i-rlu-:i(l the ceiling. Knife swildies are provided. ctt OIL FILTERING PLANT. The three substations located at .Ashcville, Canal Winchester andHooker are all similar, being designed to receive two 400-kw. rotaryconverters, only one being installed in each at this sub-station buildings, like the power station, are of fireproof to isolate the oil switches and also the static interrupters, readyaccess to these switches being had by means of a gallery over the oilswitches. The bus bars and high tension leads are supported oninsulators mounted on iron pins which are carried on pipe brackets. Sept. 20. 1904.] STREET RAILWAY RENIEW. 567 Electric Line Construction. The high tension line from the power station to the sub-stationsis substantially built. The poles are 40 ft. long with tops 7 in. indiameter, and are spaced 100 ft. apart. Two cross-arms are mountedon each pole, the top cross arm being 4^^x5^Sx70 in. long designedfor two pins and insulators. The lower cross arm is 4^^<x5^<.\ioo and has space for four p
Size: 1909px × 1309px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No
Keywords: ., book, bookcentury1800, bookdecade1890, booksubjectstreetrailroads