![](http://www.alamy.com/thumbs/6/BF4EAE3E-6DB4-42C6-9FE5-F75293B09BF7/TY5J07.jpg)
Highway bridge pier No. 2 showing ground leveled to elevation 942, preparatory to driving piling for enlargement of the pier.; Scope and content: Photograph from Volume Two of a series of photo albums documenting the construction of the Grand Coulee Dam and related work on the Columbia Basin Project.
Size: 5550px × 4503px
Photo credit: © Tango Images / Alamy / Afripics
License: Licensed
Model Released: No
Keywords: