. Building and repairing railways . Stone Stringer and Strap Rail, Baltimore & Ohio Railroad, A. D. 1833. Thiswas a favorite American Wooden Stringer and Strap Rail, Albany & Schenectady Railroad, A. A strap rail was used on many of the first railroads in America, par-ticularly in the Central and Western States. Fig. G. 32 BUILDING AND REPAIRING RAILWAYS. The method of constructing track with stoneblocks and stone stringers gave a rigid road bedand rough riding track which were very destruc-tive to locomotives and cars. This led to theintroduction of the T rail and the use of


. Building and repairing railways . Stone Stringer and Strap Rail, Baltimore & Ohio Railroad, A. D. 1833. Thiswas a favorite American Wooden Stringer and Strap Rail, Albany & Schenectady Railroad, A. A strap rail was used on many of the first railroads in America, par-ticularly in the Central and Western States. Fig. G. 32 BUILDING AND REPAIRING RAILWAYS. The method of constructing track with stoneblocks and stone stringers gave a rigid road bedand rough riding track which were very destruc-tive to locomotives and cars. This led to theintroduction of the T rail and the use of crossties.*


Size: 1738px × 1438px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookcentury1900, bookdecade1900, booksubjectrailroa, bookyear1901