. Building a railroad; a handbook devoted to a new, speedy and economical method of performing every operation from grading right-of-way to ballasting and maintaining track . cher. Coal lor two Ditchers Oil, waste, lor Ditcher 50 Oil, waste, etc., 2 Ditchers Coal. 2 tons at , for locomotive Coal, for locomotive Ditcher engineer at 8125 per mo . 2 Ditcher engineers oil, waste, etc., on locomotive. . Oil, waste, etc., on . Ditcher fireman at 2 Ditcher flremen Train conductor Train conductor 2 brakemen


. Building a railroad; a handbook devoted to a new, speedy and economical method of performing every operation from grading right-of-way to ballasting and maintaining track . cher. Coal lor two Ditchers Oil, waste, lor Ditcher 50 Oil, waste, etc., 2 Ditchers Coal. 2 tons at , for locomotive Coal, for locomotive Ditcher engineer at 8125 per mo . 2 Ditcher engineers oil, waste, etc., on locomotive. . Oil, waste, etc., on . Ditcher fireman at 2 Ditcher flremen Train conductor Train conductor 2 brakemen at Two brakemen at . Locomotive engineer Locomotive engineer /A» fireman Locomotive fireman /..-r-. -gtOO :-200 yards per day = , I] 400yardsperday = per cubic pard with Single cost per cubic yard with Double Ditcher Work Train. 1 ] Ditcher Work Train. — = Thus it will be seen that the Double Ditcher Work Train will doright-of-way ditching at a saving of per cubic yard, over the SUigle DitcherWork Train. 50 Building a Railroad Removing Slides. Lifting a Good SizedBoulder If material coversthe track, head theAmerican into thesHde on a flat car, cast-ing over if it is a side-liillcut. If it is a throughcut and the materialco\ers the track theAmerican can pick upthe material in front anddeposit it either onto a flat or into a dump car in the rear. A dump car serves admirably in this work, as it can be taken out to end of the cut and dumped very quickly and set back to the machine, with very little loss of maximum digging radius of 30 ft. 6 in. from center of track gi\-es ample room for future slides, without their co\ering the track. Or the American will work right into the slide under its own power, on the standard gauge track, casting over as it clears the way. Boulders, trees, snow, water and other obstacles that limit the efficiency of the hand crew an


Size: 1833px × 1364px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookauth, bookcentury1900, bookdecade1910, bookidcu31924004135566