. Electric railway journal . granted for this first electrification, and the work,which is to be completed in 1918, has already been be-gun between Erstfeld and Bellinzona, a distance of 67%miles. At Amsteg a hydroelectric plant able to supply32,000 hp is being installed, and at Piotta a similarplant of 39,000 hp. One station alone, however, couldtake the loads expected in 1918, namely, 12,000 hp nor-mal and 32,000 hp maximum. These stations will alsobe tied in with others to avoid possible failure of power generated will be conducted at 60,000 volts tofrom three to six substations,


. Electric railway journal . granted for this first electrification, and the work,which is to be completed in 1918, has already been be-gun between Erstfeld and Bellinzona, a distance of 67%miles. At Amsteg a hydroelectric plant able to supply32,000 hp is being installed, and at Piotta a similarplant of 39,000 hp. One station alone, however, couldtake the loads expected in 1918, namely, 12,000 hp nor-mal and 32,000 hp maximum. These stations will alsobe tied in with others to avoid possible failure of power generated will be conducted at 60,000 volts tofrom three to six substations, from which the currentwill be stepped down and delivered to a 15,000-volt or7500-volt trolley. In view of the experience of the Lotschberg Railway,it has been definitely decided to use the single-phase sys-tem. Even if 7500 volts were reserved eventually forthe Gotthard line, 15,000 volts could be adopted for therest of the federal lines, where tunnels are less choice of system is most significant because what-. CHT VERKEHRT AB5TEIGEHI


Size: 2994px × 835px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookcentury1900, bookdecade1900, bookpublishernewyorkmcgrawhillp