The crew and service module for Artemis I continue preparations for mating inside the Operations and Checkout (O&C) Building High Bay at Kennedy Space Center on March 21, 2019. Alongside, the pressure vessel for Artemis II is undergoing install of its secondary structure.


Size: 5616px × 3744px
Photo credit: © NASA/piemags / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: assembly, crew, em-1, em-2, esm, european, exploration, mission-1, mission-2, module, orion, pressure, production, protection, service, system, thermal, vessel