Stockholm - Råslagen Railways, SRJ CO 91 and SRJ CO 93 were delivered after rebuilding in Arlöv 1948-12-15. Wagons SRJ CO 90, SRJ CO 92 and SRJ CO 94 were delivered after rebuilding in Arlöv 1949-03-03. In the picture, all remodeled wagons have been collected. For all wolves, they were rebuilt and repaired at ASJ Arlöv. The platforms have been built in, the clothing internally of the veneer has been replaced by such a masonite painted in standard colors, insulation in the walls with isoflex is designed, the sofas changed and unpleased ceiling and plate covering repaired where required, 125 vol


Stockholm - Råslagen Railways, SRJ CO 91 and SRJ CO 93 were delivered after rebuilding in Arlöv 1948-12-15. Wagons SRJ CO 90, SRJ CO 92 and SRJ CO 94 were delivered after rebuilding in Arlöv 1949-03-03. In the picture, all remodeled wagons have been collected. For all wolves, they were rebuilt and repaired at ASJ Arlöv. The platforms have been built in, the clothing internally of the veneer has been replaced by such a masonite painted in standard colors, insulation in the walls with isoflex is designed, the sofas changed and unpleased ceiling and plate covering repaired where required, 125 volt lysipoter lighting is installed. The sofas changed and stopped at Mörby.


Size: 2594px × 1926px
Photo credit: © BTEU/JANG / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: