. Electric railway journal . coppertrolley wire is used and the feeders are of the same normal conditions of operation all of the substa-tions feed into the trolley wire, which is maintainedcontinuous throughout the entire length of the are made, however, for sectionalizing theline in times of trouble. The normal rating of eachsubstation is 500 kw. Load conditions were the deciding factor in locatingthe substation at Bringhurst, miles from Salt LakeCity, approximately midway between Granger and Lin-don substations. This location was also readily accessi-ble for


. Electric railway journal . coppertrolley wire is used and the feeders are of the same normal conditions of operation all of the substa-tions feed into the trolley wire, which is maintainedcontinuous throughout the entire length of the are made, however, for sectionalizing theline in times of trouble. The normal rating of eachsubstation is 500 kw. Load conditions were the deciding factor in locatingthe substation at Bringhurst, miles from Salt LakeCity, approximately midway between Granger and Lin-don substations. This location was also readily accessi-ble for connection with some of the existing 44,000-voltlines of the Utah Power & Light Company, from whichcompany 60-cycle power is purchased for the operationof the entire road. General Features of Bringhurst Substation The building is of brick, 52 ft. x 34 ft. in plan, withwalls 18 ft. high. It is fireproof and has steel rooftrusses and asbestos-covered corrugated iron roofing. December 2, 1916J ELECTRIC RAILWAY JOURNAL 1143. UTAH SUBSTATION BRINGHURST SUBSTATION OF SALT LAKE & UTAH RAILROAD, SHOWING INCOMING HIGH-TENSION LINES; ALSO THREE-PHASE AIR-BREAK SWITCHES AT POINT WHERE TAP LINE TO SUBSTATION CONNECTS WITH TRANSMISSION LINE The energy is received from the Utah Power & LightCompanys lines at 44,000 volts and delivered to thetrolley line at 1500 volts through two 750-volt, 250-kw. rotaries connected in series. At present there arethree rotaries installed with wiring so arranged thatany two can be operated together. The station andswitchboard will care for two additional rotary con-verters and the accompanying transformers, which willgive the station an ultimate rated capacity of 1000 kw. Conduits have been laid to care for the equalizingcables which will be necessary when the two sets ofrotaries are operated in parallel. In the future instal-lation, a three-pole breaker will be mounted on the nega-tive panel to care for the three equalizer leads, andthis breaker will be


Size: 2447px × 1021px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookcentury1900, bookdecade1900, bookpublishernewyorkmcgrawhillp