Theme photo Emscher conversion, the Emscher system will be free of wastewater in 2021 - construction of a new sewer on the Boye, the second largest tr
Theme photo Emscher conversion, the Emscher system will be free of wastewater in 2021 - construction of a new sewer on the Boye, the second largest tributary of the Emscher, a machine operator in the tunnelling machine digs the tunnel for the DN 3500 concrete wastewater pipes, the Boye will be renaturalized, will be transformed into a near-natural watercourse, was previously an open, surface sewer, combined sewer with surface water and wastewater, the ecological conversion of the Emscher system consists of the construction of a central wastewater treatment system in the Ruhr area, the construction of sewers and the renaturation of the Emscher and its tributaries, archive photo from 13. , Bottrop, Ruhr area, North Rhine-Westphalia, Germany - model released -.
Size: 3840px × 5760px
Photo credit: © Rupert Oberhäuser / Alamy / Afripics
License: Licensed
Model Released: No
Keywords: 3500, area, bgi, blue-green, body, boring, bottrop, boye, building, canal, civil, concrete, conservation, construction, description, digging, dn, drilling, driving, earth, ecological, ecology, economy, emscher, engineering, environment, environmental, europe, european, format, german, germany, green-blue, green-blue-infrastructure, head, hf, human, industry, infrastructure, investment, job, machine, man, management, measure, nature, north, nrw, occupation, operator, pipe, pipes, project, protection, reconstruction, renaturation, resource, resources, rhine-westphalia, river, ruhr, sewage, sewage-free, sewer, site, system, technology, tube, tunnel, tunnelers, underground, vertical, vtm, water, watercourse, work, worker, workplace