Theme photo Emscher reconstruction, the Emscher system will be free of wastewater in 2021 - new construction of a sewer on the Boye, the second larges


Theme photo Emscher reconstruction, the Emscher system will be free of wastewater in 2021 - new construction of a sewer on the Boye, the second largest tributary of the Emscher, concrete pipes with hydraulic joints allow stronger curve driving, the Boye will be renaturalized, will be transformed into a near-natural watercourse, was previously an open, surface sewer, combined sewer with surface water and wastewater, the ecological reconstruction of the Emscher system consists of the construction of a central wastewater treatment system in the Ruhr area, the construction of sewers and the renaturation of the Emscher and its tributaries, archive photo from 13. , Bottrop, Ruhr area, North Rhine-Westphalia, Germany.


Size: 3840px × 5760px
Photo credit: © Rupert Oberhäuser / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: 3500, area, bgi, blue-green, bottrop, boye, build, builder, canal, canalization, civil, concrete, conservation, construction, curve, dn, driving, ecological, ecology, economy, emscher, engineering, environment, environmental, europe, european, format, german, germany, green-blue, green-blue-infrastructure, hf, industry, infrastructure, investment, management, manhole, measure, nature, north, nrw, pipe, pipes, project, protection, reconstruction, renaturation, resource, resources, rhine-westphalia, river, ruhr, sewage-free, sewer, shaft, site, system, tube, tunnel, tunneling, vertical, wastewater, water, watercourse, work, worker