. Electrical news and engineering. NEWS 31 bourne, Kingsbury. New Rockland, Waterloo, Foster, Knowl-ton, Cowansville, Sweetsburg, Granby, Broniptonville Sher-brooke, Lennoxville. Huntingville, Massawippi, Ways Mills,Boynton, Libbytown, North Hatley, Capelton, Compton,Eustis, Waterville. Rock Island, Stanstead, Beebe. BeebeJunction, Ayers Cliff. Hatley, all in the Province of Quebec;Derby Line and Derby Centre, \erniont. The plants, it will be noticed, are located over a widearea, and. in order to link up the system and to consolidate it 1917; the profits have risen from $)6 to $311,722; a
. Electrical news and engineering. NEWS 31 bourne, Kingsbury. New Rockland, Waterloo, Foster, Knowl-ton, Cowansville, Sweetsburg, Granby, Broniptonville Sher-brooke, Lennoxville. Huntingville, Massawippi, Ways Mills,Boynton, Libbytown, North Hatley, Capelton, Compton,Eustis, Waterville. Rock Island, Stanstead, Beebe. BeebeJunction, Ayers Cliff. Hatley, all in the Province of Quebec;Derby Line and Derby Centre, \erniont. The plants, it will be noticed, are located over a widearea, and. in order to link up the system and to consolidate it 1917; the profits have risen from $)6 to $311,722; and thesurplus from $7,9:i6 to $47,347. The officers and board of directors have been strength-ened from time to time by the inclusion of technical andbusiness men. The president is Mr. W. C. Hawkins, manag-ing director of the Dominion Power and Transmission Com-pany, Hamilton, Ont.; the vice-president is Mr. F. W. Teele,formerly general manager of the Porto Rico Railways Com-pany. Trinidad Electric Railway, Demerara Electric Com-. TRAN5MlbSI0H Sy5T£MREF£:i?ENCE mNiciPAtmES sexi^fP • UHPEVELOPEP<f».TERPOIVER PEVELOPEP ASTEAM PLANT O ivsterpowerS steam X TKANSMISSION LINES — CONNECTING LINES —— WATERSHEP BOUNPARY RAILWAYS Showing territory served by Southern Canada Power Co. with a view to economical operation, it has been necessaryto construct 300 miles of transmission line, in addition towhich 100 miles are being built or will have to be built. Thelines are on wooden poles. The transmission is 25,000 and50,000 v., and distribution 2,200 v., 3 phase. 60 cycle, An extensive program of improvements to the electricalplants and to the sub-stations has been carried out. Newsub-stations have been built and others altered in order tomeet the altered conditions. Outdoor sub-stations are therule in small places, and the indoor type wherever it is neces-sary to employ a switchboard attendant. The company has adopted a progressive policy in thematter of induc
Size: 1923px × 1299px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No
Keywords: ., bo, bookcentury1800, bookdecade1890, bookidelectricalnewsen27donm