140130-N-ZI300-110 NAVAL SUPPORT ACTIVITY BAHRAIN (Jan. 30, 2014) Technicians discuss the move fo a tied arch bridge, known as the flyover bridge, before approaching the Khalifa Bin Salman Causeway. Tghe bridge will connect Naval Support Activity (NSA) Bahrain to the Navy port facility (NSA II). The meter long, meter high, 2650 metric ton bridge was constructed on NSA II, and will be driven across the causeway on self-propelled modular trailers (SPMT), and set in place on pre-constructed abutments. The greatest benefit of this process allows Bahrain traffic to be disrupted fo


140130-N-ZI300-110 NAVAL SUPPORT ACTIVITY BAHRAIN (Jan. 30, 2014) Technicians discuss the move fo a tied arch bridge, known as the flyover bridge, before approaching the Khalifa Bin Salman Causeway. Tghe bridge will connect Naval Support Activity (NSA) Bahrain to the Navy port facility (NSA II). The meter long, meter high, 2650 metric ton bridge was constructed on NSA II, and will be driven across the causeway on self-propelled modular trailers (SPMT), and set in place on pre-constructed abutments. The greatest benefit of this process allows Bahrain traffic to be disrupted for hours as opposed to months it would have taken to build the bridge in place. ( Navy photo by Mass Communication Specialist 1st Class Steve Smith/Released) Technicians discuss preparations for the move of the tied arch bridge, known as the flyover bridge, that will connect Naval Support Activity Bahrain to the Navy port facility, Jan. 30, 2014, in Bahrain 140130-N-ZI300-110


Size: 1870px × 1336px
Photo credit: © PJF Military Collection / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: activity, armed, army, bahrain, bridge, conflict, construction, corps, engineers, expansion, flyover, forces, military, mobile, naval, nsa, nsai, nsaii, propelled, spmt, states, support, trailers, united, usace, war