. Building a railroad; a handbook devoted to a new, speedy and economical method of performing every operation from grading right-of-way to ballasting and maintaining track . ny roads is to put the Amer-ican on a flat between two 15 to 20 yard materialdump cars, load them at the rate of 50 to 60 yardsan hour, then pull the train out and dump them. Crew line-up: One operator for American fireman for American Ditcher. Air dump cars are admirable for this roads put permanent track on the flat car onwhich the Ditcher stands, instead of using the portabletrack sections furn


. Building a railroad; a handbook devoted to a new, speedy and economical method of performing every operation from grading right-of-way to ballasting and maintaining track . ny roads is to put the Amer-ican on a flat between two 15 to 20 yard materialdump cars, load them at the rate of 50 to 60 yardsan hour, then pull the train out and dump them. Crew line-up: One operator for American fireman for American Ditcher. Air dump cars are admirable for this roads put permanent track on the flat car onwhich the Ditcher stands, instead of using the portabletrack sections furnished with the machine. Muchtime is saved with the dump car train over stringingthe cable to unload material with an unloading plow,as is customary when using flats. This permits thematerial to be pulled a much greater distance to un-load, get back onto the job, and yet handle moreyardage in a given time. The dump car train, being lighter, permits morespeed and better timewhen moving than ispossible with the hea-vier flat car train. Itcan, therefore, worklonger before clearing fortrains and show greateryardage in a given the materialcan be used to advan- -w. The Dump Car Work Train 48 Building a Railroad


Size: 2210px × 1130px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookauth, bookcentury1900, bookdecade1910, bookidcu31924004135566