. Annual report 1919. it isexpected that the order will be placed in December. Drawings of the building are being prepared and the erection of the buildingwill be proceeded with early in 1920. CENTRAL ONTARIO SYSTEM HEALEY FALLS GENERATING STATION The 3,750-kv-a. generator purchased from the Swedish General ElectricCompany was installed and placed in operation on September 21, 1919. Thismachine is known as No. 4 generator. Complete tests were made by the Com-missions engineers before the generator was placed in service. Instructions have been received to purchase and instal equipment for No. 4


. Annual report 1919. it isexpected that the order will be placed in December. Drawings of the building are being prepared and the erection of the buildingwill be proceeded with early in 1920. CENTRAL ONTARIO SYSTEM HEALEY FALLS GENERATING STATION The 3,750-kv-a. generator purchased from the Swedish General ElectricCompany was installed and placed in operation on September 21, 1919. Thismachine is known as No. 4 generator. Complete tests were made by the Com-missions engineers before the generator was placed in service. Instructions have been received to purchase and instal equipment for No. 4outgoing 44,000-volt line, which will deliver power to the tie line now underconstruction between Healey Falls and Peterboro. This equipment is expected tobe ready for service earlv in 1920. \~~~\/2:/r£Z0s//ivzz3 D IS -KEY- Power/Yoc/sesSe/6- 5/&//os?3?SmYe/?//7<7ro&ec/or a/iater Co^s/r^/cZ/o/? ^SE5S Supenea/m? C-/S4 o/~Ocf^S-/9/z. HYDBO-EIECTRIC POWER COMMISSI^ OrOMTARIQ Central Ontario System DssexoffTo OcMer 25-J9/8PevJsed Ocf30. 1919 ? P/crorf C-20S ffLAf 1920 HYDRO-ELECTRIC POWER COMMISSION 209 RANNEYS FALLS DEVELOPMENT On account of the cessation of hostilities also partly due to volume of otherwork, the electrical and building designs for the Eanneys Falls development havenot been proceeded with. Some further investigation of the proposed developmenthas been carried out, however, during the past year. It is expected that this development will be started early in 1920. AUBURN TRANSFORMER AND SWITCHING STATIONS When it was decided to run a 44,000-volt tie from Healey Falls connectingstation to the Auburn Transformer Station at Peterboro, some changes had to bemade in the switching tower at the Auburn Station. Outdoor equipment waschosen and arrangements are being made to instal a Canadian Westinghouse44,000-volt, type , electrically operated, oil circuit breaker, and a setof air-insulated current tr


Size: 2017px × 1239px
Photo credit: © The Reading Room / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookauthorontarioh, bookcentury1900, bookdecade1910, bookyear1919