. Electric railway review . ny, January 1, 1907. The station contains three 1,200-kilowatt three-phase 25-cycle alternating-currentgenerators, direct connected to 30 and 50 by 60 inch cross- April IS, 1908. ELECTRIC RAILWAY REVIEW 481 compound engines; four 800-kilowatt 600-volt direct-currentgenerators, direct connected to 32 by 60 inch simple engines. The boiler plant at this station consists of 15 (4,000 squarefeet) OBrien water tube boilers, equipped with the Jonesunder-feed stokers. When this plant was acquired it had been operating asa non-condensing plant. We at once began th
. Electric railway review . ny, January 1, 1907. The station contains three 1,200-kilowatt three-phase 25-cycle alternating-currentgenerators, direct connected to 30 and 50 by 60 inch cross- April IS, 1908. ELECTRIC RAILWAY REVIEW 481 compound engines; four 800-kilowatt 600-volt direct-currentgenerators, direct connected to 32 by 60 inch simple engines. The boiler plant at this station consists of 15 (4,000 squarefeet) OBrien water tube boilers, equipped with the Jonesunder-feed stokers. When this plant was acquired it had been operating asa non-condensing plant. We at once began the necessarypreparation and now have a cooling tower and condenser in-stallation practically completed. This condenser plant con-sists of one Alberger centrifugal condenser, having a 54-inchexhaust steam connection, the water from which is handledby one 24-inch centrifugal pump, driven by two Westinghousehigh-speed engines, operating at 250 revolutions per cooling tower installation consists of four Alberger cool-. United Railways of St. Louis—Creve Coeur Substation. ing towers, having a capacity of 50,000 pounds each, or a totalcapacity of pounds of steam per hour. Handling thisamount of steam a vacuum of 25 inches is guaranteed. All electrical equipment in this station is of the GeneralElectric type, the engines being of three different types,namely. Fulton Iron Works. Allis-Chalmers and Hamilton. Thecoal and ashes in this plant are handled by a Link Belt pivotedbucket conveyor in connection with a Link Belt gravity dis-charge elevator, it being arranged so that coal and ashes canlie h;i ml led simultaneously. Substations. In the order of their capacity the different substationswill next be described: The Central substation is located at 1711 Locust the heart of the downtown district. It contains eight1,000-kilowatt 600-volt six-phase rotaries; also one 5,000-am-pere-hour storage battery. The air-cooled transformers forthe rotaries are three to
Size: 1721px × 1452px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No
Keywords: ., bookcentury1900, bookdecade1900, booksubjectstreetr, bookyear1906