The control room is lifted as part of the physical demobilization of the Yabucoa Substation mega-generator, Yabucoa, Puerto Rico, August 18, 2018. The Puerto Rico Electric Power Authority (PREPA) determined there is sufficient power generation and/or transmission at the Yabucoa Substation and requested the Army Corps of Engineers demobilize the mega-generator at Yabucoa. The demobilization of the mega-generators is a positive step in the ongoing recovery process in Puerto Rico.
Size: 1155px × 1732px
Photo credit: © Bob Collet / Alamy / Afripics
License: Licensed
Model Released: No
Keywords: air, america, archive, armed, army, corps, defence, engineers, fema, force, forces, hurricane, maria, military, navy, power, puerto, recovery, reportage, rico, service, serviceman, servicemen, soldier, states, temporary, united, usa, usace