. Electric railway journal . Oregon Electric Railway—Map of Electric Railways in Operation or Under Construction in Willamette Valley this reason passengers are not allowed to pass throughthe vestibules from one car to another while the carsare running through Portland. The company is now building a freight cut-off betweenOrenco and Helvetia. The former station is on the Ore-gon Electric Railway and the latter is on the line of theUnited Railways. When completed this cut-off will allowthe freight trains to be taken off the portion of the systemof the Oregon Electric Railway where traffic is mo


. Electric railway journal . Oregon Electric Railway—Map of Electric Railways in Operation or Under Construction in Willamette Valley this reason passengers are not allowed to pass throughthe vestibules from one car to another while the carsare running through Portland. The company is now building a freight cut-off betweenOrenco and Helvetia. The former station is on the Ore-gon Electric Railway and the latter is on the line of theUnited Railways. When completed this cut-off will allowthe freight trains to be taken off the portion of the systemof the Oregon Electric Railway where traffic is most Oregon Electric Railway—Treating Poles with Preservative This cut-off is being constructed on a grade of five-tenthsof 1 per cent. All new main line of the Oregon ElectricRailway is constructed with a maximum of four-tenths of1 per cent grade and a 3 deg. curve, as the company antici-pates a large freight business and wishes to be able totake care of it economically. The company is also double-tracking its line between MATERIAL YARD The engraving on page 1050 shows the material yard ofthe company near Salem. The tracks in this yard are laidin a series of arcs of circles with considerable space be-tween them. The practice of unloading material in thisyard is as follows: As the material is brought to the yardsit is unloaded by crane on to the ground directly adjoiningand on one side of the track. After the entire length ofthe tracks is filled in this way they are shifted a few feetso that the next lot of material can beunloaded in the empty space, and thisprocess is repeated until all


Size: 2009px × 1243px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookcentury1900, bookdecade1900, bookidelectricrailway411913newy