STICKY BOMB: THE PRODUCTION OF THE No 74 GRENADE IN BRITAIN, 1943 - At a factory producing 'Sticky Bombs', foreman Arthur Garner (left) and John Clews shovel some of the raw constituents of the adhesive mixture used on the bombs down a chute to a large vat on the floor below, where these ingredients will be mixed. Arthur is using a sack barrow to push a large bale of materials forward, and John is using a spade to push the loose materials down the chute
Size: 2183px × 2289px
Photo credit: © piemags/ww2archive / Alamy / Afripics
License: Licensed
Model Released: No
Keywords: