Zeesluis de Nieuwezijlen Repair carried out in September-December 1900. Point of inclusion: within the inner barrier, approx. 60 M within the inner front. Status of work: instortebed and battle sills completed; battle styles updated; lower version Date: 10 December 1900 Location: Groningen (prov.), Nieuwe Statenzijl, Reiderland Keywords: hydraulic engineering, sea locks


Size: 2846px × 2459px
Photo credit: © BNA Photographic / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: