. Ontario Sessional Papers, 1897-98, tothe floor of this level, whence it is trammedto the shaft and raised to the rock the south part of the open pit an under-stope has been made to open through to level2, 53 by 54 feet. In level 2 north of the shaftthe stope extends 100 feet in length, 40 inwidth and raised 60 feet. South of the shaftit is 84 feet in length, 45 in width and 60feet of raise, making additional since lastentry of 84 feet in length, nine in width and20 in raise. The total extent of stope in thelevel is 184 feet in length, 45 in width and60 raise. The shaft has


. Ontario Sessional Papers, 1897-98, tothe floor of this level, whence it is trammedto the shaft and raised to the rock the south part of the open pit an under-stope has been made to open through to level2, 53 by 54 feet. In level 2 north of the shaftthe stope extends 100 feet in length, 40 inwidth and raised 60 feet. South of the shaftit is 84 feet in length, 45 in width and 60feet of raise, making additional since lastentry of 84 feet in length, nine in width and20 in raise. The total extent of stope in thelevel is 184 feet in length, 45 in width and60 raise. The shaft has been sunk 65 feet tolevel 3 at an angle of 65 degrees west. Awinze has been opened between the twolevels. A stope 23 by 66 feet -ndth 23 feetraise and an incline 69 by 25 feet has beenmade in the level. The captain informs mein a recent letter that no additional drift-ing has been done and stoping had beencontinued in the places of work at the time ofmy last visit; also that tl e shaft was putdo\\^l 20 feet and a winze is being sunk from 96.


Size: 1707px × 1463px
Photo credit: © The Reading Room / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookauthorontariolegislativeass, bookcentury1900, bookdecade1900