The foundation tub for a second 509 Revolver crane being lifted on to a gantry at Graythorp. In the early 1970s Laing Pipelines Offshore constructed the Graythorp fabrication yard and dry dock on the site of the old William Gray Shipyard. The company created a dry dock which was used for the construction of fixed platform North Sea drilling rigs for the BP North Sea Oil Project. By 1972, one thousand men were working on site to build a tubular structure which would support a drilling rig in the North Sea destined for the Forties Oilfield. The cranes on site at Graythorp included two 509 Revolv


The foundation tub for a second 509 Revolver crane being lifted on to a gantry at Graythorp. In the early 1970s Laing Pipelines Offshore constructed the Graythorp fabrication yard and dry dock on the site of the old William Gray Shipyard. The company created a dry dock which was used for the construction of fixed platform North Sea drilling rigs for the BP North Sea Oil Project. By 1972, one thousand men were working on site to build a tubular structure which would support a drilling rig in the North Sea destined for the Forties Oilfield. The cranes on site at Graythorp included two 509 Revolver cranes, capable of lifting 813 tonnes, and six Manitowoc cranes imported from America.


Size: 4977px × 6339px
Photo credit: © Historic England Archive/Heritage Images / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: 1970s, 20th, britain, british, building, century, color, colour, concept, construction, country, crane, cranes, dock, docks, dry, england, english, gantry, graving, graythorp, hartlepool, historic, industrial, industry, john, laing, lifting, location, oil, photograph, plc, seventies, site, wharf, work, working