. Cyclopedia of architecture, carpentry, and building : a general reference work. signated, are to be hauled away. The curbstone in place is to be protected so that there will beno settlement or shifting before the supporting wall is completed,by sheet piling driven down just back of the inside of curb line. The other sides of the excavations will be sloped enough toprevent caving. The excavation will not go below the party wall of adjoiningbuilding. All excavation for footings must be complete before any footingsare placed. Backfilling. After all foundation walls are completed andthoroughly s
. Cyclopedia of architecture, carpentry, and building : a general reference work. signated, are to be hauled away. The curbstone in place is to be protected so that there will beno settlement or shifting before the supporting wall is completed,by sheet piling driven down just back of the inside of curb line. The other sides of the excavations will be sloped enough toprevent caving. The excavation will not go below the party wall of adjoiningbuilding. All excavation for footings must be complete before any footingsare placed. Backfilling. After all foundation walls are completed andthoroughly set, backfilling is to be done with sand or gravel. Sewer and Water Connections. The sewer and water havealready been brought on to the site. The sewer terminates at abrick manhole, 3 feet 6 inches inside diameter, with iron cover atgrade about 5 feet from the side line of the building; and temporaryconnections with this manhole are to be made, so that there shall beat no time any standing water in the excavation, should it developthat the gravel is a water-bearing stratum. 234. M m ■i-l < ^ Q 4) o 41 o at 14 a H S < m tn o UJ fa(! d td o <J M Si Ik OJ X 6 CO 01 u. a o S5 H tM Wl P O B
Size: 1259px × 1985px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No
Keywords: ., bo, bookcentury1900, booksubjectarchitecture, booksubjectbuilding